PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Foundation wall rebar along c.l 6 from G-L Facing South-East (800x600).jpg Installing foundation wall rebar at Elev. 7-Stair -4,5 Facing North (800x600).jpg Installing rebar along 6 Line from G-L Facing North-East (800x600).jpg Installing rebar at Elev. 7-Stair -4,5 Facing North (800x600).jpg Installing wall forms along c.l 6 from G-L (800x600).jpg Shear Wall panels at Elev. -1,2,3 2nd Floor Facing South-West.jpg Stripped Elev. -1,2,3 2nd Floor Facing South-East.jpg Stripping the Shear wall panels at Elev. -1,2,3 2nd Floor Facing South-West (800x600).jpg Waterproofing along Foundation wall M line Facing South (800x600).jpg
Previous pageNext page Installing wall forms along c.l 6 from G-L (800x600)
Installing wall forms along c.l 6 from G-L (800x600)